Nice People Networking

Teleférico de Santo Domingo

The cable car has not yet been officially taken into use, but is still in a test phase. During this test phase in the month of June, free use can be made of the cable car. After June the cable car can be used at metro rates. Sosúa-News was on site to take a ride and joined in the long queue on Sunday afternoon. It is public transportation but it is also just a wonderful experience!

As everyone knows, there has been a ‘Teleférico’ (cable car) in Puerto Plata to the top of Mount Isabel de Torres for a long time. Now there is a second Teleférico in the country, but as a public means of transport. It is an extension of the existing metro lines. The cable car connects with the last station in the east of line 2, Eduardo Brito. With four stations and a length of 5 km it takes you north via ‘Los 3 Brazos’ and ‘Sabana Perdida’ to the final station Charles de Gaulle.

The cable car has not yet been officially taken into use, it is still in a test phase. During this test phase in the month of June, free use can be made of the cable car. After June the cable car can be used at metro rates. Sosúa-News was on site to take a ride and joined in the long queue on Sunday afternoon. This is both a public transportation, and  a wonderful experience!

Source: Sosua News

June 27, 2018

Category: DR News |

Los comentarios estan cerrados.

Last updated January 23, 2026 at 4:16 pm
stats for wordpress
Facebook Twitter